Projects

Grouping issues into a body of work with its own status and dates — including sub-projects and links between projects.

Available Updated 2026-09-24

A project is a body of work with a beginning and an end. Issues belong to at most one.

Project fields

FieldNotes
Name
Description
StatusPlanning, Active, Paused, Completed, or Cancelled
Start date
Due date
Parent projectOptional — makes this a sub-project

Project status is independent of the status of the issues inside it. A project can be Paused while its issues sit in whatever column they were in; a project is not Completed just because its issues are.

The projects page

g then p. Lists the team’s projects grouped by hierarchy, with a search box and a status filter. Click through to a project’s own page, which has:

  • Overview — status, dates, description, sub-projects and linked projects.
  • Issues — the issues in this project, filterable like any other list.

Each tab has its own URL, so you can link someone straight to a project’s issues.

Display and filtering

The projects page supports grid and list layouts. Display options controls grouping, ordering, visible properties and Show archived. The list supports inline status changes. Use the project filters to narrow the set independently of its layout.

Progress and estimates

Open a project’s Overview to inspect its progress chart. It compares issue scope with completed work over time and can show a predicted completion path and the project due date. The sidebar includes a compact chart and progress by issue type; project cards and rows can also show progress when that display property is enabled.

Predictions depend on the available issue history and completion rate. They are estimates, not a delivery commitment, and can change when scope or dates change. Use the chart to investigate progress rather than treating its projected date as a confirmed schedule.

Archive, unarchive and delete

Open the project’s edit dialog for these actions:

  • Archive hides the project from active views and marks its open issues Done. The confirmation states how many issues will change; this is more than hiding a card.
  • Unarchive restores the project’s visibility. It does not reopen issues that archiving completed.
  • Delete removes the project, clears its issues’ project assignment, removes project links and detaches child projects. It does not delete those issues or child projects. Review the confirmation before proceeding.

Enable Show archived in Display options to find an archived project.

Sub-projects

A project can have a parent. Use it when a large effort genuinely decomposes into smaller efforts that each have their own status and dates.

Do not use it as a second labelling system. If the children do not each deserve their own status and dates, you wanted labels or sub-issues.

Linked projects

Separate from parent/child, two projects can be linked. A link is a symmetric “these are related” relationship with no hierarchy and no status implication.

It is for the case where two efforts affect each other but neither contains the other — a platform change and the feature that depends on it, say. The hierarchy answers “what is this part of”; the link answers “what else should I look at”.

Choosing between project, label and sub-issue

The three overlap enough to be worth stating plainly:

UseWhen
ProjectA body of work with its own start, end and status, that you will report on.
LabelA property of an issue that cuts across projects. A dimension, not a container.
Sub-issueThis issue is literally part of that issue and will be done as part of it.

If you are unsure between a project and a label, ask whether you would ever say “the project is done”. If not, it is a label.

Something here wrong, missing or out of date? Tell us at support@orneos.com — corrections to these pages are welcome and we would rather hear it than have you work around it.